Wednesday, 25 January 2017

[PRACTICE] Updated Schedule

I have updated the production schedule from the last version as I felt that there wasn't enough information in regards to Max's scenes, as I feel that they need to have their own scheduling due to the time it takes to actually animate it. I also felt that it'd be easier if I added an easier to understand Key at the top with more colours than before to show more variation in where I am with that scene. You'll also notice that there is a tally at the top of the schedule as well,  this is for me to acknowledge how many scenes I have done in total and how many scenes I have left to do.


As I said in a previous post, the production has slowed down a lot as no animation was produced last week, so there will be a gap in the actual schedule, however, as long as I finish at least one more scene during this week, i'll be right on track with the schedule.