[PRODUCTION] Production Schedule

Now that I have each scene and shot list written down, this should make it easier to create a production schedule, I want to make sure I get everything done in time so I have only created the schedule up until the 27/08/2017 giving me lots of extra time at the end to clean everything up and do any post production I may need to do.

To view the Schedule, click here.

Because of this time frame, this means I will need to create 3 different shots a week in order to to make the deadline I have set, however, if I am unable to do this I still have plenty of time to finish after the deadline. The production schedule doesn't however take into consideration; Max's shots, the after credits and any other forms of the production that I may need to create (Live action videos for reference, quick drawings, soundtrack etc), it is solely a production list of each scene and shot.

Using this production schedule allows me to work at my own pace without the fear of thinking I am working too slow, or alternatively, rushing the work. I can clearly see what I have done, in what time frame and what I need to do.

No comments:

Post a Comment